Drone Arm Clevis·Nimbus Labs

Trial 1

PartialA356Mar 16, 2026

Goal

Baseline pour, mirrored pair in the cavity.

Process

Pour temp
700C
Mold temp
170C
Alloy batch
A356-2603-B
Trial date
Mar 16, 2026
Gating
Shared central runner feeding both mirrored parts.
Changed from the previous trial
First trial on this tool

What came out

Defects observed

One of the mirrored pair consistently short at the pin boss.

Lessons learned

A shared runner does not split evenly when the two halves are not truly symmetric about it.

Trial sequence

2