Gimbal Yoke·Torch Dynamics

Trial 3

FailureA356Jun 30, 2026

Goal

Run trial 2 parts through T6 and check for quench cracking.

Process

Pour temp
705C
Mold temp
185C
Alloy batch
A356-2606-C
Trial date
Jun 30, 2026
Gating
Unchanged.
Changed from the previous trial
No casting change. Added T6 heat treat.

What came out

Defects observed

Two of four cracked at the fork root during water quench.

Lessons learned

The fork root fillet is too sharp for a water quench. Opening it to R6 before the next trial.

Trial sequence

3