Wheel Hub Carrier·Orbit Mobility

Trial 2

SuccessA356May 19, 2026graduated to production

Goal

Chill the lower arm so it freezes before the boss.

Process

Pour temp
712C
Mold temp
190C
Alloy batch
A356-2605-D
Trial date
May 19, 2026
Gating
Bottom gate, boss riser, arm chill.
Changed from the previous trial
Chill added at the lower arm.

What came out

Defects observed

Clean bore and clean arm on all four. Dye penetrant passed.

Lessons learned

Directional solidification, forced. Chill the far end, feed the near end.

Trial sequence

2