Actuator Housing·Ridgeline Robotics

Trial 3

SuccessA356Mar 5, 2026graduated to production

Goal

Prove the 3.2mm boss wall from the R4 model.

Process

Pour temp
722C
Mold temp
185C
Alloy batch
A356-2603-A
Trial date
Mar 5, 2026
Gating
Unchanged from trial 2.
Changed from the previous trial
Boss wall 2.4mm to 3.2mm. Same gating as trial 2.

What came out

Defects observed

None on section or x-ray across four parts.

Lessons learned

Wall thickness was the whole story. Do not chase a feeding fix when the section is starved.

Trial sequence

3