Pump Volute·Vantage Thermal

Trial 3

PartialA413May 15, 2026

Goal

Relocate the gate away from the throat.

Process

Pour temp
690C
Mold temp
195C
Alloy batch
A413-2605-B
Trial date
May 15, 2026
Gating
Outer wall gate, throat left clean.
Changed from the previous trial
Gate moved from the throat to the outer wall.

What came out

Defects observed

Throat clean. New porosity at the outer wall where the gate now sits.

Lessons learned

Moving the problem is not solving it. The gate itself is too small and too fast.

Trial sequence

4