Turbine Inlet Housing·Kestrel Aerosystems

Trial 1

FailureA356Mar 30, 2026

Goal

First pour of the largest part on the floor.

Process

Pour temp
730C
Mold temp
200C
Alloy batch
A356-2603-D
Trial date
Mar 30, 2026
Gating
Bottom gate, three risers around the flange.
Changed from the previous trial
First trial on this tool

What came out

Defects observed

Cold shut across the top flange on both parts. Metal front stalled before it closed.

Lessons learned

The part is too big to fill from one gate at this temperature.

Trial sequence

2