Dashboard

The floor today

13
Jobs
10
In flight
27
Casting trials
16
Production runs
5
Open rework
18
Knowledge entries

Committed and open

$250,824
Accepted work
$15,920
Open quotes
98.2%
Overall yield
8
Customers

Needs attention

5

Active trials

8
TrialCustomerDateOutcomeGoal
Heat Exchanger Header T3Vantage ThermalAug 11InconclusiveConfirm the centre witness line survives a pressure test.
Harmonic Drive Bracket T3Ridgeline RoboticsJul 21InconclusiveRepeat trial 2 across eight parts to confirm the flatness is not luck.
Heat Exchanger Header T2Vantage ThermalJul 13SuccessFill from both ends and meet in the middle over a vent.
Gimbal Yoke T3Torch DynamicsJun 30FailureRun trial 2 parts through T6 and check for quench cracking.
Heat Exchanger Header T1Vantage ThermalJun 22FailureFill a 204mm long thin section from one end.
Harmonic Drive Bracket T2Ridgeline RoboticsJun 16SuccessEven out the web section and hold flatness under 0.2mm.
Harmonic Drive Bracket T1Ridgeline RoboticsMay 26PartialEstablish baseline flatness on the mounting face as cast.
Pump Volute T3Vantage ThermalMay 15PartialRelocate the gate away from the throat.
LoggedPartCustomerTriggerWhat happened
Aug 12Heat Exchanger HeaderVantage ThermalLeakCannot verify 3 bar. The shop rig tops out at 2 bar.
Aug 9Pump VoluteVantage ThermalDimensionalTwenty one parts with the inner spiral wall 0.4mm thin on one side.
Jul 3Gimbal YokeTorch DynamicsOtherQuench cracking at the fork root on two of four T6 parts.
May 4Turbine Inlet HousingKestrel AerosystemsOtherTrial 2 flange cold shut. Job held while the customer redesigns the flange.
Apr 17Coldplate ManifoldHalcyon ComputeLeakThirty nine parts failed the 2.5 bar pressure test at the far corner.

Jobs by phase

Alloy mix

A3566A3803A4134